Playground design and installation at Henry Green Primary School

Playcubed designed and installed this play area at Henry Green Primary School. The project featured an activity frame, and also included a range of artificial surfaces, a canopy, a trackway with a bridge and a sand and water play unit. The area was zoned with fencing.
Location: Dagenham, Essex.

Project: Design and installation of a play space.

Guide Budget: £40,000 to £50,000.

Install Duration: Approx. 4 weeks