Trinity St Mary's School, Trim Trial

Playground design and installation at Trinity St Mary's School

This play space was designed to provide upper body strength development. Artificial Grass surfacing with UltraMat underlay created an effective safety surface, and Rubber Mulch beneath the trees ensured the area stayed clear of shrub boarder material. The area was fenced off so use could be monitored. See our Clamber Climber options.

Location: Balham, London.

Project: Design and installation of a play space.

Guide Budget: £,000 to £,000.

Install Duration: Approx. 3 weeks

Looking for an area like this?

Similar projects

Share by: