![](https://i0.wp.com/www.playcubed.co.uk/wp-content/uploads/Star-Primary-School-30-scaled.jpg?ssl=1&w=1035&quality=85)
Star Primary School contacted Playcubed for a multi project playground redesign of their school. In the same way as so many schools, their playground was bleak, uninspiring and had a deteriorating surface. But not for long! We worked with the school to create an outstanding playground design, incorporating the existing split-level as a feature point. Quick, smooth project management and installation saw the playground installed ready for the official opening by TV personality, Mr Bloom!