Playground Design and Installation at Holy Trinity CE Primary School 

Holy Trinity CE Primary School is a newly constructed school with some very special play spaces. Due to a minimal plot size for the pupil numbers required, the school was designed with a play area and a MUGA on the roof! Playcubed were awarded the project, overcame the practical challenges and installed the area to our usual high standard. Check out the impressive result below.
School: Holy Trinity CE Primary School

Location: Hackney, London.

Project: Installation of five play spaces across different floor levels of the brand new build school.

Guide Budget: £600,000 to £650,000.

Install Duration: Approx. 14 to 15 weeks